The project is located in Minhang Aerospace City, Shanghai, with a total installed capacity of 2.3 megawatts. The project combines a parking lot with a photovoltaic power plant and is named "Satellite Panel". The design is inspired by the instantaneous image of a man-made satellite deploying solar panels in space. The solar panel components are all laid facing south at an angle of about 10 ° to the horizontal plane, effectively utilizing solar energy and fully utilizing the characteristics of solar modules to provide electricity for the entire space city park. Power generation is basically consumed by the park. The average annual power generation of the power station is 1.88 million kilowatt hours, with an average annual savings of 670 tons of standard coal and an annual reduction of 1571 tons of carbon dioxide emissions.
Zhenda Group, as the supplier of Bus duct products for the project, started in 1999 and is a modern enterprise focusing on the design, research and development, production, sales and service of Bus duct, cable bridge, distribution cabinet, seismic support and hanger products. The company's products are widely used in data communication, energy and chemical engineering, research and development and manufacturing, power grid, commercial, residential, cultural and tourism, municipal public construction, warehousing and logistics, education and treatment projects.